ESI was selected to complete a new 35 acre corporate campus for Scentsy Wickless Candles, one of America’s fastest growing new businesses. The project will include complete... Read More
The Boise State University Parking Garage - Phase II is a five story, 669 stall 225,000 SF post tensioned parking garage with an additional 7,292 SF of retail space. In... Read More
ESI is leading the Design Build team for the first phase of a new Corporate Campus for Idaho based PKG Group – a designer and manufacturer of user interface systems for the... Read More
ESI was contracted as the General Contractor / Construction Manager for the FedEx Ground Distribution Center in Stockton, California. Located between an airport and a train... Read More
ESI performed general contractor and value engineering services for Power Foods, Inc. in Boise, Idaho. ESI was the general contractor for both Phase I and Phase II of this... Read More
ESI was contracted as the General Contractor / Construction Manager to perform a $7.4 million expansion of the UPS Distribution Center located in Mesa, Arizona. The UPS... Read More
ESI performed the design and construction of a 12,780 square foot cross-dock facility including a 34-door dock area, office spaces and paved exterior truck and trailer parking... Read More
Norco is a part of the 23-acre Meridian Gateway Marketplace development on the South East Corner of Eagle Rd. and Ustick. This is a mixed use single story building with a... Read More